Half the hashrate of the Z15 Pro at around 60% of the power. Aging hardware on a niche algorithm — a speculative purchase rather than an infrastructure one.
At your electricity rate
$/kWh
Operating profit
-$2.17
per day · 0.00000023 ZEC
Break-even electricity
$0.000008
per kWh · $0.06 below your rate
Payback period
—
No payback while the machine runs at a loss
Revenue / day$0.000289
Electricity / day$2.17
Energy / day36.2 kWh
Revenue assumes a 1% pool fee at the current ZEC price and network difficulty, with the machine running continuously. Payback needs a hardware cost, which we do not publish because we have no verified retailer feed — add your own purchase price in the calculator. Your rate is saved in this browser and applies across the site.
Specifications
Manufacturer
Bitmain
Model
Antminer Z15
Algorithm
Equihash
Coins
Zcash
Hashrate
420 KSol/s
Power
1,510 W
Efficiency
3.6 W/KSol
Cooling
Air
Type
ASIC
Released
2020
Home suitable
No — noise and power draw
Noise
72 dB
Dimensions
133 × 245 × 290 mm
Weight
9 kg
Operating temperature
5 to 45 °C
Data provenance
Manufacturer datasheet as published by retailers; hashrate and power corroborated across multiple sources. Last verified 2026-08-03.
Any field not listed above is one we could not verify for this machine. We would rather leave a row out than publish a figure you cannot check. Where published sources disagree, we say so instead of picking one. How we verify specifications.
The seven-day average passed 1,000 EH/s for the first time since March 3, and chain data shows difficulty already 5.92% higher since October 16, with another increase due around October 29.
Release 34-106659 approves Cboe binary contracts on indicators that 23 listed companies report, and Marathon Digital Holdings' list covers BTC produced, blocks won, total holdings and energized hashrate. Settlement reads the figure in the company's SEC filing rather than its earnings press release, and nothing can list until Cboe Clear U.S. is registered as a clearing agency.
The miner agreed to buy an 80-megawatt Ethiopian site almost two years ago, and on September 28 the facility's power supplier gave its operator ten days to pay a disputed bill or lose collateralized equipment. BitFuFu says it is weighing termination and arbitration against the sellers.